Skip to content

REMOVE YOUR CAR HISTORY WITH CLEANVINUSA.COM

BMW M5 2025 – Low-Mileage IAAI Auction Vehicle | VIN: WBS83FK03SCU77171

VIN WBS83FK03SCU77171

VIN
WBS83FK03SCU77171
Year
2025
Make
BMW

This 2025 BMW M5 VIN WBS83FK03SCU77171 is a low-mileage example of BMW’s high-performance luxury sedan. The auction listing shows only 1,214 miles, making this vehicle particularly notable among used and insurance-auction BMW M5 listings.

The vehicle was offered through IAAI at the Chicago South, Illinois facility under lot number 42596015. It was listed in Run and Drive condition and sold on July 1, 2026, with a final bid of $87,750 USD.

Reported damage for this BMW M5 VIN WBS83FK03SCU77171 consists of minor dents and scratches. No secondary damage was specified in the available auction information. Compared with vehicles carrying structural, mechanical, flood, or major collision damage, cosmetic damage may represent a more limited repair scope, although auction photographs and an independent inspection should still be reviewed carefully.

The available data does not specify the title document, seller, exterior color, key status, estimated retail value, or estimated repair cost. These details should be confirmed directly from the original IAAI listing or vehicle documentation before making decisions regarding purchase, repair, resale, registration, or export.

With its 2025 model year, very low reported mileage, Run and Drive status, and $87,750 final auction bid, this BMW M5 represents a significant high-value auction transaction. Buyers researching VIN WBS83FK03SCU77171 should verify its complete title history, service records, cosmetic condition, and auction photographs.